Yokogawa 767402-P2

Input Connection 1/4 NPT

Open Market / 45 Days

Yokogawa 767402-U1

kPa

Open Market / 45 Days

Yokogawa 767402-U2

kPa,kgf/cm2,mmH2O,mmHg

Open Market / 45 Days

Yokogawa 767402-U3

kPa,psi,inH2O,inHg

Open Market / 45 Days

Yokogawa AQ1100A-ASC

Angled PC SC type Connector

Open Market / 45 Days

Yokogawa R-DTW200-160RF6

Reduced Tip,1.5 inch (Flanged Thermowell , Raised Face), U = 16.0 inch

Open Market / 45 Days

Yokogawa R-DTW200-160RF4

Reduced Tip, 1 inch (Flanged Thermowell, Raised Face), U = 16.0 inch

Open Market / 45 Days

Yokogawa F3BU04-0N-D1

Power supply (F3PU10/16) slot and 4 slots for CPU and I/O with rail mount kit...

Open Market / 45 Days

Call

Yokogawa R-DTW200-165RT3

Reduced Tip, 3/4 inch NPT Threads, (Threaded Thermowell), U = 16.5 inch

Open Market / 45 Days

Yokogawa R-DTW200-165RT4

Reduced Tip, 1 inch NPT Threads, (Threaded Thermowell), U = 16.5 inch

Open Market / 45 Days

Yokogawa R-DTW200-165RW3

Reduced Tip, Welded, 3/4 inch Pipe Size, (Socket Weld Thermowell), U = 16.5...

Open Market / 45 Days

Yokogawa AQ1100A-H

GB standard, Complied with CCC

Open Market / 45 Days

Yokogawa AQ1100A-HC

Chinese/English

Open Market / 45 Days

Yokogawa AQ1100A-HJ

Japanese/English

Open Market / 45 Days

Yokogawa AQ1100A-PPM

PON Optical Powermeter

Open Market / 45 Days

Yokogawa AQ1100A-F

VDE standard

Open Market / 45 Days

Yokogawa AQ1100A-HK

Korean/English

Open Market / 45 Days

Yokogawa AQ1100A-HE

English

Open Market / 45 Days

Yokogawa AQ1100A-HR

Russian/English

Open Market / 45 Days

Yokogawa AQ1100A-P

EK standard (S. Korea)

Open Market / 45 Days

Yokogawa AQ1100A-R

AS standard

Open Market / 45 Days

Yokogawa F3BU06-0N-D1

Power supply (F3PU10/16) slot and 6 slots for CPU and I/O with rail mount kit...

Open Market / 45 Days

Call

Yokogawa 735101-D

UL/CSA standard and PSE compliant, Rated voltage: 125 V

Open Market / 45 Days

Yokogawa 701992-SP05

Standard Edition (5 licenses)

Open Market / 45 Days

Yokogawa F3BU16-0N

For Power supply (F3PU20/F3PU30/FBU26/FPU36) + 16 slots (CPU+I/O)

Open Market / 45 Days

Call

Yokogawa F3PU20-0S

100 to 240V AC, 5V DC/4.3 A rated output (for 5, 9, 13 and 16 slots, M4...

Open Market / 45 Days

Call

Yokogawa F3PU30-0S

100 to 240V AC, 5V DC/ 6.0A rated output (for 5, 9, 13, and 16 slots, M4...

Open Market / 45 Days

Call

Yokogawa F3PU36-0S

24V DC, 5V DC / 6.0A rated output (for 5, 9, 13, and 16 slots, M4 screws)

Open Market / 45 Days

Call

Yokogawa 735182-03

19" rack mount kit C (132.5)

Open Market / 45 Days

Yokogawa 701992-GP20

Math Edition (20 licenses)

Open Market / 45 Days

Yokogawa 701992-SP10

Srandard Edition (10 licenses)

Open Market / 45 Days

Yokogawa 701993-GP20

Math Function Add-On(20 licenses

Open Market / 45 Days

Yokogawa 701992-SP20

Standard Edition (20 licenses)

Open Market / 45 Days

Yokogawa 751535-E5

Rack Mounting Kit

Open Market / 45 Days

Yokogawa 415921

Shunt Resistor for M4 screw terminals: 100 ohm +/- 0.1%

Open Market / 45 Days

Yokogawa 438921

Shunt Resistor, 100Ohms 0.1%, for clamped input Terminal

Open Market / 45 Days

Yokogawa 735102-D

UL/CSA standard and PSE compliant, Rated voltage: 125 V

Open Market / 45 Days

Yokogawa 415920

Shunt Resistor for M4 screw terminals: 250 ohm +/- 0.1%

Open Market / 45 Days

Yokogawa 438920

Shunt Resistor, 250Ohms 0.1%, for clamped input Terminal

Open Market / 45 Days

Yokogawa 438922

Shunt Resistor, 10Ohms 0.1%, for clamped input Terminal

Open Market / 45 Days

Yokogawa 415922

Shunt Resistor for M4 screw terminals: 10 ohm +/- 0.1%

Open Market / 45 Days

Yokogawa AQ1100A-ULC

Universal adapter (LC)

Open Market / 45 Days

Yokogawa AQ1100A-USC

Universal adapter (SC)

Open Market / 45 Days

Yokogawa AQ1100B-H

GB standard, Complied with CCC

Open Market / 45 Days

Yokogawa AQ1100B-HJ

Japanese/English

Open Market / 45 Days

Yokogawa AQ1100B-P

EK standard (S. Korea)

Open Market / 45 Days

Yokogawa AQ1100B-USC

Universal adapter (SC)

Open Market / 45 Days

Yokogawa AQ1100D-D

UL/ CSA standard

Open Market / 45 Days

Yokogawa AQ1100D-HE

English

Open Market / 45 Days

Yokogawa AQ1100D-HR

Russian/English

Open Market / 45 Days